Quote:
Originally Posted by uDevil
TBF, this kind of thing tends to be on again off again. And a state of the art fab is a big gamble. Here, they want to implement smaller features (7nm) and bigger wafers (450 mm) at the same time. My guess is the $7B estimate is way too low. Well, unless they can get Trump to do the job.
If they are implementing EUV, the 7B estimate is definitely too low.
Honestly not quite sure how Intel lost the process technology lead they've had since their inception. Somebody screwed up right around 20nm.