Quote:
Originally Posted by Lego05
Assuming a standard deviation of around 150, I would probably take it.
that would be a big mistake imo. and i think the stdev will likely be a fair bit higher (which would help you but even at 180 its still a rather large mistake). not sure if its my place to go all strat itt about how to get the numbers so ill just leave it at that, i guess.
but ill add that i think its 95% likely the edge is between -5 and +5 and probably 75% likely -3 and +3. big blinds*
Last edited by TooCuriousso1; 09-15-2013 at 03:21 AM.