Just got back from my weekly condo check. Work is coming along but seems slow. I think it's mostly due to how much time it is taking them to lay the living room tile. They are about 1/3 of the way finished with it. They are also about 2/3 of the way finished with the master bath tile. The electrician installed a bunch of switches and receptacles and they look great.
I talked to Javier for a bit. He told me the bathroom tile was taking a while because of how heavy it is. He says he can't put more than 2 rows up at a time because stuff starts sliding. He also showed me how he is having to level the living room floor since the slab is crooked. Although I understand this, it is causing a weird visual effect that the floor is actually crooked. I guess due to the fact that the roof is probably as off as the slab. He didn't notice it but I do. Hopefully this sort of disappears when "stuff" is put in the room.
I'm super happy with my tile choices and the paint choices are growing on me.
Pics and stuff.
Living room
This first pic shows how much they are raising the tile on this side. Crazy.
Living room and office
Master bath
This pic isn't good but on the left is the master bedroom paint and on the right is the master bath paint. The master bath paint is actually a few shades lighter but you can't tell. It almost looks grey but they are both fairly blue.
New light switch!!!!